There are different methods for measuring of transformer winding, likewise. The impulse test is one of several tests designed to verify the dielectric strength of the many insulation structures within the distribution transformer against line voltage surges. Basics, maintenance, and diagnostics xi contents continued page 9. What is the megger test procedure for transformers. Mainly two types of transformer testing are done at manufacturer premises type test of.
Power transformer testing and commissioning guidelines r. Transformers regulate the voltage in circuits, but in some cases these can go bad and cause a circuit to not. In the uk this was, until january 1995, 415 v threephase and 240 v phase to neutral. There are various test required on transformer to conform performance of transformer. Abb supplies the widest range of power distribution transformers, including specific designs for power centres, substations, networks and padmounts. Pdf transformer testing type test and routine test of. We repeat the test for all tap position separately. The international electrical testing association neta is an accredited standards developer for the american national standards institute ansi. The power partners commitment to manufacture quality distribution transformers is backed by a series of transformer tests used to verify conformance to. Transformer bushing cts should be tested using the current. Connect the 120 v, 60 hz power through the lamp to the transformer. Case 1 is only interconnecting cable between upstream and downstream panels, e. Simulate appropriate tests to evaluate the condition and perform maintenance on transformers.
Transformers are an electrical component that transmit electrical energy between at least two circuits. Standard for acceptance testing specifications for. Hence every electrical power transformer must undergo through vector group test of transformer at factory site for ensuring the customer specified vector group of transformer. Testing of power transformers seems like a similar experience. Neta is the leading source of specifications, procedures, testing, and requirements. Vector group test of power transformer electrical4u. The procedure of the transformer ratio test is simple. Noise measurements of the power transformers aleksandra petrovic1, ljubomir lukic1. Neta defines the standards by which electrical equipment is deemed safe and reliable. Analyze test results to troubleshoot transformer problems. This method statement will give a brief steps to be carried out for testing and pre commissioning of transformers. For conducting heat run test on the three phase transformer, full rated. The transformer testing performed before commissioning the transformer at the site is called the precommissioning test of the transformer. To fill in the test protocols, signing in the appropriate box.
Factory acceptance tests fat the routine tests shall be made with each electrical equipment and, whenever practicable. When testing transformer windings with a very low impedance generally the low voltage side, it can be. It evolved from the simple gonogo verdict into a sophisticated segment within transformer manufacturing. The power transformer testing fat test is performed after completion of the assembly at the manufacturing shop. Whether the transformers are used for wind, solar or hydro applications, actom distribution transformers can supply mineral oilfilled, cast resin dry type or environmentally friendly kclass ester oilfilled transformers. Ensure that all equipment to be tested is properly grounded and treat all highvoltage power equipment as energized until proven otherwise by using the proper lockouttagout procedures. The high voltage winding of the transformer under test and the high voltage terminals of the ratio meter are connected to a low voltage single phase source. Mainly two types of transformer are done by manufacturer before dispatching the transformer mainly 1 type test of transformer and 2 routine test. Distribution transformer testing power partners usa. Test procedure for coppedfullwave on the tail impulse 12. In addition some other tests are also carried out by the consumer at site before commissioning and also periodically. Testing manual for electrical equipment requirements are fulfilled. The standard megger testing equipment is used, the line terminal of which is connected to the winding or core bolt under test.
Stringent quality control has to be ensured right from selection of raw materials, manufacturing to procurement and installation of these transformers. Before proceding with transformer measurements the test engineer will become familiar with the safety rules of section 2. It rating plate show nominal voltage, current of the primary. Before conducting a transformer winding resistance test, it is important to observe all safety warnings and take proper precautions. Our distribution transformer test system dtts has been designed with these requirements in mind, as a multifunctional tool for testing distribution transformers. Testing and commissioning procedure for electrical installation 1. Actom distribution transformers is the leader in the supply of transformers for the renewable energy sector. Interpret nameplate data and use the data to set up correct test procedures.
The induced voltage on the low voltage side of the transformer is connected to the low voltage terminals of the ratio meter. High voltage transformer distribution transformer all day efficiency of. A primary part of commissioning a transformer involves testing it after its installation in the field. Generator stepup auto transformer stepdown pads transformer transformer 11510 or 20 kv 500230 230. Instructional video on distribution transformer testing. Due to transport limitation and for convenience of storagehandling at site, if a unit can be dispatched completely assembled then the transformer is usually dispatched from the factory with. Also the transformer is always to be switched to the maximum possible voltage during this test.
In any pd test circuit, the real measurable charge qm integral of the circulating pd current it, is dependent 80 ontheratioofcouplingcapacitancecktotestobjectcapacitancect,seefigure9. Distribution transformers can be shipped complete in standard shipping container. Distribution transformers are normally considered to be those transformers which provide the transformation from 11 kv and lower voltages down to the level of the final distribution network. In addition to the above transformer testing methods, the power transformer also goes through some other tests, performed on it, before the actual commissioning of the transformer at the site. The connection arrangement for a kick test for a current transformer is presented in figure 3. Neta developed specifications for the acceptance of new electrical apparatus prior to energization and for the maintenance of existing apparatus to determine its suitability to remain in service. Inspect transformer and parts for shipping damage and moisture. Perform oil sampling, testing, drying, filling and filtering. Distribution transformers maintenance guide for liquid. Improve the quality control of the project and simplify the procedures for engineers. Manufacturers test thousands of distribution transformers at worldwide. Some tests and procedures may be performed by specialists during the. The international electrical testing association neta was formed in 1972 to establish uniform testing procedures for electrical equipment and apparatus.
Selection guide abbs liquid filled power distribution transformers range from 16 kva upwards, with primary voltages up to 72. Download as ppt, pdf, txt or read online from scribd. Tamil nadu electricity board tneb, tamil nadu generation and distribution corporation limited tangedco, tamil nadu. Power transformer testing and commissioning guidelinesr sahoo procedure of power transformer testing and commissioning in transformer testing and commissioning, it can be classified into power and distribution transformers. A free powerpoint ppt presentation displayed as a flash slide show on id. Theory heat run test is one of the type tests on power transformer. Following is an approximate sequence for transformer testing. The charge transfer processes between capacitances ct and ck cause a residual voltage dropures. It is therefore most vital asset in any electrical distribution network and needs special attention right from erection, commissioning and maintenance of these transformers. Transformer testing commissioning, routine, diagnostic.
Introduction the procedures stated in this document cover the activities in preliminary tests and inspections, functional performance tests and the commissioning of newly completed installations and existing ones after major alteration. It is performed to comply with ansi standards and for quality assurance. This amounts to a rigorous examination of the transformer intended to. We measure the induced voltages at hv and lv terminals of the transformer to find out actual voltage ratio of the transformer. Transformer testing has developed considerably over the past years. To carry out the tests according to the standards and test procedures defined. A list of standards applicable to distribution transformer is given as below. Vector group test of transformerthe vector group of transformer is an essential property for successful parallel operation of transformers. In this book we have laid down important aspects on transformer.
It is not a complete stepbystep procedure for performing tests and is not replacing the user manual for the actual instrument. Power transformer testing and commissioning guidelines r 1. Before commencement of any test make sure the surroundings near clear off from any unwanted materials etc, and make proper approach, scaffolding etc. Noise measurement of transformer 112 mva the test procedure is in accordance with iec standard 6007610. We just apply three phase 415 v supply to hv winding, with keeping lv winding open. Transformer testing type tests and routine tests of. Power transformer testing fat test inspection for industry. This test reproduces conditions of continuous rated load and the temperature rise occurring during the load. The distribution utilities have generally been procuring transformers with maximum allowable. Insulation resistance tests megger test are carried out on all windings, core and core clamping bolts. Short circuit test and differential stability stable condition.
129 1365 1382 1498 469 557 566 541 1085 1148 1121 1564 1107 587 345 1029 1607 1664 140 80 1204 67 2 510 4 1161 610 138 1102 682 1433 159 397 896 1456 3 51 142 574 1052 1153 1252 1352 560 558